Site-wise manpower control across a moving workforce
Ramya Constructions manages crews across active sites where people move between locations weekly. EmplAI brought site attendance, wage accuracy and manpower planning into one system.
- Industry
- Construction & infrastructure
- Workforce
- Site engineers, supervisors, skilled and contract labour
- Spread
- Multiple active sites and a head office
- Modules used
- Attendance, Field tracking, Leave, Payroll, Assets, Documents, Mobile app
What was getting in the way
Site registers arrived late and rarely matched
Supervisors maintained paper muster rolls that reached the office days after the fact.
Wage disputes at every payout
Days worked, overtime and site allowances were contested because there was no verifiable record.
No live view of manpower per site
Management could not tell how many people were actually on a site on a given day.
Statutory documents were scattered
Labour compliance paperwork sat in files at different sites, making inspections stressful.
Tools and equipment went untracked
Assets moved between sites with no record of who held what.
How EmplAI was set up
Geo-fenced site attendance
Every site has a fence; workers and supervisors punch from the app or the site biometric device, so the register is built where the work happens.
Field tracking for supervisors
Multi-site supervisors log visits automatically, and travel allowance is calculated from actual movement.
Wage rules per site and skill
Daily wage, overtime and site allowances are configured once and applied without manual calculation.
Central compliance vault
Licences, worker IDs and statutory documents live in one encrypted vault with expiry reminders.
Asset register per site
Tools and equipment are issued digitally and recovered through the exit checklist.
Where the money is saved
- Ghost and duplicate attendance removed because punches are tied to place and person.
- Overtime is approved before it happens instead of discovered at payout.
- Equipment losses cut through digital issue and recovery records.
How manpower is planned now
- Manpower requirement per project phase is forecast from actual attendance load, not estimates.
- Crews are reallocated between sites using live utilisation instead of hiring locally in a hurry.
- Labour budget per project is tracked against actual site cost every week.
“We now know exactly who was on which site yesterday — and payroll simply agrees with it.”
— Project management team, Ramya Constructions